Skip to content

PlanetSafe · Customer Portal

All assets

PS-5J4B8

Pallet wrapper power unit

Brisbane depot · Charging bay

Failed — action required

Test history

2 recorded events
  1. 6 Feb 2026FAIL

    M. Calloway · Imported from tester export

    Measurements (3)
    MeasurementValueLimit appliedOutcome
    Visual inspectionFail—FAIL
    Earth continuity0.12 Ω≤ 1.0 ΩPASS
    Insulation resistance0.62 MΩ≥ 1.0 MΩFAIL
  2. 6 Aug 2025PASS

    M. Calloway · Imported from tester export

    Measurements (3)
    MeasurementValueLimit appliedOutcome
    Visual inspectionPass—PASS
    Earth continuity0.12 Ω≤ 1.0 ΩPASS
    Insulation resistance0.62 MΩ≥ 1.0 MΩPASS

Test events are permanent records. Corrections appear as new entries that supersede the original — the original stays visible.

Failures and actions

  • You were notified

    Recorded 6 Feb 2026

    Insulation resistance below limit (0.62 MΩ, limit ≥ 1.0 MΩ)

Identity

PlanetSafe asset ID
PS-5J4B8
Your reference
QLD-4237
Equipment class
Class I
Site
Brisbane depot
Area
Charging bay
Retest interval
6 months
Next due
6 Aug 2026