Visit summary
Collins St office · visit 14 May 2026
176
168
8
0
8
R. Okafor
13
| Asset | Item | Failure reason | Status |
|---|---|---|---|
| PS-GCKYA | Pallet wrapper power unit | Insulation resistance below limit (0.62 MΩ, limit ≥ 1.0 MΩ) | action required |
| PS-VWPJ5 | Kettle | Insulation resistance below limit (0.62 MΩ, limit ≥ 1.0 MΩ) | action required |
| PS-9AGYH | Heat gun | Insulation resistance below limit (0.62 MΩ, limit ≥ 1.0 MΩ) | customer notified |
| PS-TT68C | Power board 4-way | Insulation resistance below limit | action recorded |
| PS-J6ZFM | Hot water urn | Insulation resistance below limit (0.62 MΩ, limit ≥ 1.0 MΩ) | awaiting retest |
| PS-SGTV9 | Refrigerator | Insulation resistance below limit (0.62 MΩ, limit ≥ 1.0 MΩ) | awaiting retest |
| PS-XYFH6 | Sandwich press | Insulation resistance below limit (0.62 MΩ, limit ≥ 1.0 MΩ) | retested fail |
| PS-AZK4R | Monitor power supply | Insulation resistance below limit (0.62 MΩ, limit ≥ 1.0 MΩ) | closed |
Test results are the recorded outcome of each individual portable appliance test.
Results reflect portable appliance testing carried out to AS/NZS 3760 at the date shown. Testing is one element of an electrical safety programme and does not by itself establish compliance with an organisation’s broader obligations.